What is the difference between a pseudo tie and a dynamic schedule?
What is reviewed in the system evaluation described in Step 4 of the Pseudo-Tie Transfer Process Flow document?
When do the pseudo tie eligibility criteria have to be satisfied in order to offer an external capacity resource as a Capacity Performance resource into a Reliability Pricing Model or RPM auction?
Is there eligibility criteria a generating unit must meet in order to pseudo tie into PJM?
Does a generation owner have to notify its native balancing authority of their intent to participate in the PJM market?
Does the generator need to be in-service prior to requesting to dynamically transfer?
How long must a dynamic transfer remain in PJM’s market?
How does a generation owner terminate a dynamic transfer?
How does a generator withdraw a dynamic transfer request?
What is the minimum size of generator that is eligible for a dynamic transfer? Why?
Where can I find a list of units that have pseudo tied into PJM on pjm.com?
Are intermittent resources eligible to pseudo tie into PJM?