Subscribe to Interconnection Queue
Select the download icon below if you would like to subscribe to this calendar using the default calendar program installed on your device. Copy the link if you would like to subscribe using another calendar program.
Google Calendar

|
|
All Other Calendars
|
Need help subscribing? Jump to:
iCal Instructions
iPhone Instructions
Outlook 2007 Instructions
Outlook 2010 Instructions
Outlook 365 Instructions
Google Calendar Instructions
Yahoo Beta Calendar Instructions
Apple iCal - Mac
- From within iCal, from the Calendar menu at the top of your screen, choose Subscribe.
- Enter the full URL (listed above) to the desired iCalendar file in the Subscribe to: box and click Subscribe.
- iCal will download the calendar and bring you to a screen which allows you to give a title to that calendar. Check the Refresh: checkbox and select every day, which will instruct iCal to check for updates to the calendar on a daily basis.
- That's it. Your new calendar will appear, and you can choose to show or hide it by selecting or deselecting the calendar's title in the Calendars screen.
Apple iPhone
- On the iPhone navigate to Settings -> Mail, Contacts, Calendars -> Add Account -> Other -> Add Subscribed Calendar.
- Enter the full URL (listed above) to the Server field. It may be easier to email yourself the the ics link then copy and paste it on the iPhone.
- Click Save after the calendar has been downloaded.
- That's it. Your new calendar will appear, and you can choose to show or hide it by selecting or deselecting the calendar's title in the Calendars screen.
Microsoft Outlook 2007 - Windows
- In Outlook 2007 go to File -> Import and Export.
- Choose Import an iCalendar (.ics) or vCalendar file (.vcs).
- Navigate to the saved ics file or enter the full URL (listed above) to the desired iCalendar file.
- You will be prompted to either save as a new calendar in Outlook (select Open as New) or import it into your default Outlook calendar (select Import)
Microsoft Outlook 2010 - Windows
- Open Outlook 2010.
- Select top Menu File -> Open -> Import.
- Choose Import an iCalendar (.ics) or vCalendar file (.vcs).
- Navigate to the saved ics file or enter the full URL (listed above) to the desired iCalendar file.
- Click OK.
Microsoft Outlook 365
- Go to outlook and navigate to “Other Calendars” section
- Right Click on “Other Calendars” —> Click on Add Calendar —> From Internet
- Add this URL to the new calendar subscription: https://www.pjm.com/pjmfiles/calendar/PJM-Training.ics and click OK
- The PJM-Training or the added calendar should be visible in the Other Calendars section, and meeting events will shows up in the calendar.
Google Calendar
- Go to https://www.google.com/calendar and sign in. If you do not have a Google Account, you can create one using the link provided at the bottom of the page.
- On the left side of the screen, select the arrow that appears to the right of the Other calendars section.
- Select Add by URL
- In the popup window back on Google calendar, paste the link in the URL box and select the Add Calendar button.
- The calendar will be listed in the Other calendars section and now appear on your Google calendar.
Yahoo beta Calendar
(Any computer with a Web browser)
- Go to https://www.yahoo.com/calendar and sign in. If you do not have a Yahoo Account, you can create one using the link provided at the top of the page.
- Click on the + sign located next to Calendars on the menu on the left, select Subscribe to Calendar.
- Enter the URL of the iCalendar file and select Next on the top menu. Add text to Display As and select Save on the top menu.
- The new calendar will now appear and is accessible from the Calendars menu located on the left side of the screen.