Question:How is cost allocation calculated for network upgrades?
Answer:The Feasibility Study report represents the total cost of the upgrades. Cost allocation per project is provided in the System Impact Study phase. PJM has a set of cost allocation criteria that determines whether the project will be assigned a cost for their impact on the facility. If the upgrade is greater than $5 million, then the project must increase the applicable facility rating by 1 percent and have a full megawatt contribution greater than 5 MW. If the upgrade is less than $5 million, it must either satisfy the criteria outlined above or have 5 percent DFAX on the facility and increase the facility rating by 3 percent. Furthermore, if the voltage level of the impacted facility is less than 500 kV, the project must have 5 percent DFAX or have a full megawatt contribution greater than 5 percent of the applicable facility rating. If the voltage level of the impacted facility is greater or equal to 500 kV, the project must have 10 percent DFAX or have a full megawatt contribution greater than 5 percent of the applicable facility rating. Please consult PJM Manual 14A, Attachment B for further details.
Feasibility Study and Impact Study Reports
-
I have questions about the study results in my report. What’s the best way to get information?
-
What is Commercial Probability?
-
Can my project connect if the system upgrades in my report are not built yet?
-
How is cost allocation calculated for network upgrades?
-
Would downsizing my project reduce the network upgrade costs?
-
Are network upgrade costs allocated to projects in prior queues?
-
What does the "Type" column in the report index represent?
-
What is the difference between Gendeliv MW Impact and Full MW Impact?
-
Why are withdrawn or deactivated units highlighted in my report?
-
How much can I reduce my project size by?
-
Are projects allocated cost proportionally to their impact?
-
What does the ID# represent in the overload section of the report?
-
In the report index, what do the suffixes (such as C or E) mean for each generator?
-
What is the significance of the Local Energy Deliverability section?